5-105. DUMP
TM 9-2320-272-24-4
FOLLOW-ON TASKS:
Install dump roller arms (para. 5-104).
Install dump body (para. 4-144).
Fill hydraulic reservoir to proper oil level (LO 9-2320-272-12).
Start engine (TM 9-2320-272-10) and operate dump through full range. Check for
leaks and proper operation.
5-625