INDEX
Para
Page
Cleaning and inspection.
.....
3-150c
3-414
Disassembly.
. .....................
3-150b
3-414
Installation.
. .......................
3-150e
3-416
Removal.
. ............................
3-150a
3-412
Propeller shaft, transfer case-
to-front axle, replacement:
Installation.
. .......................
3-149b
3-410
Removal.
. ............................
3-149a
3-410
Propeller shaft, transmission-
to-transfer case,
maintenance:
Assembly .
...........................
3-148c
3-408
Disassembly.
. .....................
3-148b
3-408
Installation.
. .......................
3-148d
3-408
Removal.
. ............................
3-148a
3-406
Proportioning valve, brake,
replacement:
Installation.
. .......................
3-199b
3-546
Removal.
.............................
3-199a
3-546
Protective control box
replacement:
Installation.
. .......................
3-115b
3-304
Removal.
. ............................
3-115a
3-304
PTO-to-hydraulic pump
propeller shaft, transfer,
replacement:
Installation.
. .......................
3-393b 3-966
Removal.
. ............................
3-393a
3-966
Pulley (M939/A1), alternator,
replacement:
Installation.
. .......................
3-81b
3-232
Removal.
. ............................
3-81a
3-232
Pulse sensor (M939/A1),
tachometer replacement:
Installation.
. .......................
3-94b
3-268
Removal.
. ............................
3-94a
3-268
Pulse sensor (M939A2),
tachometer replacement:
Installation.
........................
3-95b
3-270
Removal.
. ............................
3-95a
3-270
Pump (M939/A1), power
steering, maintenance:
Assembly.
. ..........................
3-236c
3-672
Disassembly.
. .....................
3-236b
3-672
Installation.
........................
3-236d
3-673
Removal.
.............................
3-236a
3-672
Pump (M939/A1), water
maintenance:
Assembly .
...........................
4-63c
4-384
Cleaning and inspection.
.....
4-63b
4-381
Disassembly.
. .....................
4-63a
4-378
Pump (M939/A1), water,
replacement:
Installation.
. .......................
3-68b
3-200
Removal.
. ............................
3-68a
3-200
TM 9-2320-272-24-4
(Contd)
Para
Page
Pump (M939A2), power
steering, repair:
Assembly.
. ..........................
4-127c
4-676
Cleaning and inspection.
.....
4-127b
4-676
Disassembly.
. .....................
4-127a 4-674
Pump (M939A2), water,
maintenance:
Cleaning and inspection.
.....
3-69b
3-202
Installation.
. .......................
3-69c
3-202
Removal.
. ............................
3-69a
3-202
Pump, engine oil, repair:
Assembly.
. ..........................
5-11d
5-88
Cleaning and inspection.
.....
5-11b
5-84
Disassembly.
. .....................
5-11a
5-78
Repair.
. ...............................
5-11c
5-86
Pump, fuel injection,
calibration:
Cylinder phasing (timing).
...
5-37b
5-266
External stop setting.
.........
5-37m
Fuel breakaway test.
.
5-37j
5-278
5-277
.........
Fuel delivery test.
. ..............
5-37i
5-276
Full load delivery.
...............
5-37g
5-274
High-speed fuel delivery
test .
..................................
5-37d
5-270
Lock timing.
........................
5-37c
5-268
Low idle fuel delivery test.
..
5-371
5-278
Low-speed fuel delivery
test.
. .................................
5-37e
5-270
Manifold pressure
compensator test.
. ............
5-37h
5-275
Prestroke and rack
travel.
. ..............................
5-37a
5-262
Rated speed test.
................
5-37f
5-272
Starting fuel delivery test.
...
5-37k
5-277
Pump, fuel injection,
maintenance:
Barrel and control rack
removal.
. ...........................
5-36c
5-246
Camshaft installation.
........
5-36i
5-258
Camshaft removal .
.............
5-36a
5-240
Cleaning and inspection.
.....
5-36d
5-248
Delivery valve and
barrel installation.
............
5-36f
5-252
Leakage test.
......................
5-36e
5-250
Plunger and control rack
installation.
. .....................
5-36g
5-254
Tappet and plunger
removal.
. ...........................
5-36b
5-244
Tappet and spring
installation.
. .....................
5-36h
5-256
Pump, fuel injection, pretest:
Cylinder phasing (timing).
...
5-32b
5-216
Fuel breakaway test.
..........
5-32j
5-222
Fuel delivery test.
. ..............
5-323
5-220
Full load delivery.
. ..............
5-32f
5-220
Index 49