TM-9-2320-273-20

TRUCK TRACTOR, LINE HAUL; LIGHT EQUIPMENT TRANSPORTER; TRUCK CHASSIS; MEDIUM EQUIPMENT TRANSPORTER

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE

NOVEMBER 1980

  TM-9-2320-273-20 - Page 1386 of 1500

TM 9-2320-273-20
WINCH.
2-8. WINCH CABLE MAINTENANCE.
THIS TASK COVERS: (APPROXIMATE TIME REQUIRED FOLLOWS TASK DESCRIPTION.)
a. Removal.
(15)
b. Installation.
(20)
35 Minutes Total.
INITIAL SETUP
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
M916 and M920.
None.
None.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
None.
PERSONNEL REQUIRED
Two (MOS-63B20) .
REFERENCES (TM)
TM 9-2320-273-10.
TROUBLESHOOTING REFERENCES
Table 12-1, 12-2.
SPECIAL ENVIRONMENTAL CONDITIONS
Vehicle Park ad on Level Ground.
GENERAL SAFETY INSTRUCTIONS
Engine OFF.
Transmission in Neutral.
Park Brake Set.
12-10


Back to Top