TM-9-2320-273-20

TRUCK TRACTOR, LINE HAUL; LIGHT EQUIPMENT TRANSPORTER; TRUCK CHASSIS; MEDIUM EQUIPMENT TRANSPORTER

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE

NOVEMBER 1980

  TM-9-2320-273-20 - Page 894 of 1500

TM 9-2320-273-20
PUSHER AXLE.
Unscrew and remove.
Remove.
Remove.
Place in panel (3).
8-16. PUSHER AXLE PRESSURE GAGE MAINTENANCE (Continued).
LOCATION/lTEM
ACTION
REMARKS
A. REMOVAL (Continued).
5. Two nuts (9).
6. Two brackets (10).
7. Gage (1).
8. Gage (1).
9. Two brackets (10).
10. Two nuts (9).
11. Fitting block (7).
12. Air lines (5) and (6).
13. Bulb/lamp assembly (4).
14. Panel (3).
C. OPERATIONAL CHECK.
15. Engine.
16. Pressure gage.
17. Engine.
Put in place. Screw in and
tighten four screws (2).
Start up (see TM 9-2320-
273-10).
Check readings as regulator
valve is actuated (see TM 9-
2320-273-10).
Shut down (see TM 9-2320-
273-10).
Place in position over
gage studs.
Screw on and tighten.
Apply liquid teflon to threads
and screw into the rear of gage
(1).
Screw on and tighten.
Connect.
8-40


Back to Top