TM-9-2320-279-10-1

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

OPERATOR’S MANUAL VOLUME 1 OF 2

DECEMBER 1998
CHANGE 5

  TM-9-2320-279-10-1 - Page 313 of 773

TM 9-2320-279-10-1
M977 and M985 Tanker Operating Procedures
2-18. M977, M985 CRANE OPERATION (MANUAL CONTROLS) (CONT).
CAUTION
Keep hook block at least 2 ft (0.61 m) from end of boom.
If hook block hits end of boom it may damage cable or
hook block and crane will lose power. Wait 6 seconds for
power to return and check crane for damage.
NOTE
When crane is overloaded, M977 and M985 overload
systems will automatically shut off power to telescope
boom out, raise boom, or hoist load any higher. The
M977 overload system will also prevent lowering
boom. Overload condition can be corrected by
lowering load to ground or other supporting surface
by using hoist control level only.
When telescoping the boom, the TELESCOPE and
HOIST control levers should be operated at the same
time.
Crane movement from one lever may be slower than
the other when operating two levers together.
(3)
Move TELESCOPE control lever (3) to OUT position to extend
boom (2) and move HOIST control lever (4) to DOWN position to pay
out cable (5).
2-222
Change 5


Back to Top