TM-9-2320-279-10-1

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

OPERATOR’S MANUAL VOLUME 1 OF 2

DECEMBER 1998
CHANGE 5

  TM-9-2320-279-10-1 - Page 714 of 773

TM 9-2320-279-10-1
Preparation for Transport and Operation (Cont)
E-6.
REMOVE/INSTALL VENT ROLLOVER RAILS.
a.
Remove Vent Rollover Rails.
WARNING
Wet metal surfaces are slippery. Use extreme care when
climbing on tank or injury could result from a fall.
(1)
Remove two screws (3) and washers (2) from vent rollover rail (4).
(2)
Pull vent rollover rail (4) toward manhold cover (5) until it is clear of
retainers (6).
(3)
Secure washers (2) and screws (3) to vent rollover rail (4).
(4)
Remove vent rollover rail (4) from vehicle.
(5)
Remove other vent rollover rail (7) by repeating steps (1) through (4).
(6)
Stow vent rollover rails (4 and 7) for transport as instructed by
loadmaster.
E-12
Change 5


Back to Top