TM-9-2320-279-10-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

OPERATOR’S MANUAL VOLUME 2 OF 2

DECEMBER 1998
CHANGE 3

  TM-9-2320-279-10-2 - Page 753 of 819

2-88.
2-88.
TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
a. Perform Emergency Hydraulic Operation When Crane Electrical
Power Fails.
(1)
If crane electrical power system fails during crane operation, crane will
be locked in position it was in at time of failure.
(2)
Do not try to operate any electrical equipment on vehicle or crane.
(3)
Do not try to repair electrical system.
NOTE
This procedure will provide emergency hydraulic
power to lower crane and load when electrical power
has failed.
Screwdriver can be put in slot in front of solenoid
valve button to hold button in while operating
controls.
(4)
Push up and hold solenoid valve button (l).
(5)
Shut down crane (para 2-63).
(6)
Notify organizational maintenance.
2-668


Back to Top