TM-9-2320-279-20-1

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; ORGANIZATIONAL MAINTENANCE, VOLUME 1 OF 3

  TM-9-2320-279-20-1 - Page 151 of 985

TM 9-2320-279-20-1
Troubleshooting Malfunctions (Cont)
Tab/e 2-9. Troubleshooting (Cont)
Change 3
2-66.1/(2-66.2 blank)
Malfunction
Test or Inspection
Corrective Action
Step 1.
Check for defective engine speed control wiring. Disconnect plug from engine high idle as-
sembly. Set multimeter to test for 24 Set
Set ENGINE and PTO ENGAGE switches to ON
and crane POWER
switch to OFF. Place
negative (-) probe in socket No. 4 and touch posi-
tive (+) probe to PIN No. 1. Meter
should
show 24 vdc.
If meter does not show 24 vdc, trace wiring and find problem. Refer to FO-1, Electric
Diagram.
Step 2.
Check for defective crane power wiring. Disconnect plug from engine high idle assembly,
Set
multimeter
to test
for 24 vdc. Set
crane POWER switch to ON. Place negative (-)
probe
in
socket No. 4 and
positive (+) probe to PIN No. 2. Meter should show 24 vdc.
If meter does not show 24
vdc, repair No. 310 wire to crane junction box. If problem
is not solved, report problem to the supervisor.


Back to Top