TM-9-2320-279-20-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; ORGANIZATIONAL MAINTENANCE, VOLUME 2 OF 3

  TM-9-2320-279-20-2 - Page 912 of 938

TM 9-2320-279-20-2
Winches, Cranes, and Power Takeoff (PTO) Maintenance Instructions (Cont)
17-33. OUTRIGGER BEAM ASSEMBLY COVER REMOVAL/INSTALLATION (CONT).
a.
b.
c.
Removal.
(1)
Remove 12 nuts (1), lockwashers (2), and washers (3) from studs (4).
(2)
Remove outrigger cover (5) from outrigger beam assembly (6).
Installation.
(1)
Install outrigger cover (5) on outrigger beam assembly (6).
(2)
Install 12 washers (3), lockwashers (2) and nuts (1) on studs (4).
Follow-on Maintenance.
None.
END OF TASK
17-160


Back to Top