TM 9-2320-279-20-3
M978 Tanker Maintenance Instructions (Cont)
25-19. V5 AIR ACTUATED FLOW VALVE AND FLANGE COUPLINGS
REMOVAL/INSTALLATION (CONT).
(3)
Soldier A installs two flange
coupling halves (7) with
four screws (8),
lockwashers (9), and
nuts (10) on pipe (3) and
valve (4) while Soldier B
supports V5 air actuated
flow valve (5).
(4)
Install airhose (11) on
connector (12).
(5)
Install two coupling gaskets (13 and 14) on pipe (15).
25-94