TM 9-2320-279-20-3
M978 Tanker Maintenance Instructions (Cont)
CAUTION
Do not tear or otherwise damage coupling
gaskets during installation. If coupling
gaskets are damaged, piping connections
will leak.
(4)
(5)
(6)
(7)
(8)
Install coupling gasket (7) on V11 FLOW
VALVE (REG) (3).
Position adapter (8) against V11 FLOW
VALVE (REG) (3) and install coupling
gasket (7) over ends of valve and
adapter.
Hold adapter (8) in place and install two
coupling halves (9) with screws (10) and
nuts (11).
Make sure valve handle (12) is set to
closed position.
Install dust cap (13).
c. Follow-on Maintenance.
(1)
Perform filtered bulk unloading (TM 9-2320-279-10).
(2)
Check V11 FLOW VALVE (REG) for leaks.
(3)
Close pump module rear access doors (TM 9-2320-279-10).
END OF TASK
25-26. V12 BOTTOM LOAD PRECHECK VALVE REMOVAL/INSTALLATION.
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
References
M978
None
Test Equipment
Equipment Condition
None
TM or Para
Condition Description
Special Tools
TM 9-2320-279-10 Pump module rear access
None
doors opened.
Supplies
Special Environmental Conditions
Compound, sealing, pipe thread, Item 18,
None
Appendix C
General Safety Instructions
Personnel Required
No
smoking, flame, sparks, and hot or glowing
MOS 63S, Heavy wheel vehicle mechanic
objects within 50 ft (15 m) of vehicle.
25-121