TM-9-2320-279-34-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS DIRECT SUPPORT AND GENERAL SUPPORT, VOLUME 2 OF 3

  TM-9-2320-279-34-2 - Page 338 of 632

TM 9-2320-279-34-2
Frame Maintenance Instructions (Cont)
NOTE
Do not tighten nuts until all screws are installed.
(6) Install six spacers (18) and right pedestal support (19) with six screws (20) and nuts (21).
(7’) Install rear fishplate (22) with two screws (23) and nuts (24).
(8) Install five screws (25) and nuts (26).
(9) Install front fishplate (27) with seven screws (28) and nuts (29).
c. Follow-on Maintenance.
(1)
Install battery box (TM 9-2320-279-20).
(2) Install fuel tank (TM 9-2320-279-20).
(3) Install crane (para 18-2).
END OF TASK
13-87


Back to Top