TM 9-2320-279-34-3
M977, M985,
(11)
Connect four hydraulic
lines (21).
(12)
Raise boom (22) and remove
wood block.
and M984E1 Crane Maintenance Instructions (Cont)
d. Follow-on Maintenance.
(1)
Install hoist drain lines (para 17-2).
(2)
Install cargo body rear panel (TM 9-2320-279-10).
END OF TASK
17-16.1. LIFT CYLINDER REMOVAL/INSTALLATION (M984E1).
This task covers:
a. Removal
c. Follow-on Maintenance
b. Installation
INITIAL SETUP
Models
Equipment Condition
M984E1
TM or Para
Test Equipment
TM 9-2320-279-1
None
TM 9-2320-279-1
Special Tools
None
Supplies
TM 9-2320-279-1
Condition Description
0
Recovery system lowered.
0 Crane in operating position,
extension 1 and 2 fully
extended and lowered to
ground.
0 Shut off engine.
Compound, sealing and thread locking,
Special Environmental Conditions
Item 26, Appendix C
None
Personnel Required
General Safety Instructions
MOS 63W, Wheel vehicle repairer
None
References
Level of Maintenance
None
Direct Support
Change 2 17-78.1