TM 9-2320-279-34-3
Power Takeoff (PTO) and Hydraulic Pump Maintenance Instructions (Cont)
(19)
Install roller assembly (29), bearing spacer (30), and roller
assembly (29) into input gear (31).
NOTE
Line up flat spot on idler shaft with setscrew hole.
(20)
Install idler shaft (32), with slot facing out, in PTO (22) until about 1/4 in. (6 mm) shows in
opening in PTO.
(21)
Install thin thrust washer (33), thrust bearing (34), and thick thrust washer (35) on idler
shaft (32).
(22)
Install input gear (31) on idler shaft (32) and press idler shaft through input gear, leaving space to
install thrust washers (33 and 35) and thrust bearing (34).
(23)
Install thin thrust washer (33), thrust bearing (34), and thick thrust washer (35) under input
gear (31).
(24)
Press idler shaft (32) into PTO (22).
19-12.9