TM-9-2320-283-20-1

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 1 OF 3

DECEMBER 1983

  TM-9-2320-283-20-1 - Page 787 of 926

TM 9-2320-283-20-1
COOLING SYSTEM
3-53.
RADIATOR REPLACEMENT (Continued)
LOCATION/ITEM
ACTION
REMARKS
C.
INSTALLATION (Continued).
33.
Hose (6).
Install onto item (7).
Use thread sealing tape
on item (7).
34.
Hose (16) and
Install onto items (14) and
hose (22).
(15).
35.
Hose (12), hose
a.
Push items (12) and (13)
(13), and two
through item (10).
clamps (11).
b.
Put one item (11) on each
item (12) or (13).
c.
Push items (12) and (13)
onto item (14).
d.
Position item (11) on ends
of items (12) and (13),
and tighten screws.
NOTE
Follow-on maintenance action required:
Install grille (para 3-268).
Install brush guard (para 3-236).
Fill cooling system (para 3-52).
Install hood (para 3-269).
Check transmission fluid level and
fill as required (para 3-135).
Start vehicle and check for leaks
(TM 9-2320-283-10).
3-270


Back to Top