TM 9-2320-283-20-1
COOLING SYSTEM.
3-58.
LINES, FITTINGS, AND HOSES REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
A.
INSPECTION.
1.
All hoses and tubes
Inspect for leaks, cracks,
If any item (1) thru (9)
(1) thru (9)
kinks, stains, and other
is damaged, do the fol-
damage lowing:
a.
Drain coolant to
level below damaged
part.
b.
Replace damaged part
as shown in subpara-
graphs b thru i.
c.
Go to follow-on main-
tenance.
B.
DEAERATION LINE REPLACEMENT.
2.
Hose (2)
Remove from items (12) and
(13).
3.
Reducer (13)
Remove from item (14).
4.
Reducer (12) and
Remove from item (10) and
connector (11)
separate.
5.
All parts
Clean and inspect
Refer to paragraphs 3-4
and 3-5.
6.
Reducer (12) and
a.
Wrap threads with thread
Refer to paragraph 3-7.
connector (11)
sealing tape.
b.
Screw together and install
into item (10).
7.
Reducer (13)
a.
Wrap threads with thread
sealing tape.
b.
Screw into item (14).
8.
Hose (2)
Install on items (12) and
(13).
3-298