TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 14 of 852

TM 9-2320-283-20-2
ELECTRICAL SYSTEM.
3-69.
TASK SUMMARY (Continued).
LIST OF TASKS
Task
Troubleshooting
Task
Ref
Ref No.
No.
Task
(Page)
6
Pushbutton Starter Switch Replacement
3-75
2-11
a.
Removal.
3-75a
b.
Installation.
3-75b
c.
Operational Check.
3-75c
7
Ether Start Switch Replacement
3-76
2-11
a.
Removal.
3-76a
b.
Installation.
3-76b
c.
Operational Check.
3-76c
8
Pushbutton Clearance Lamp Switch
Replacement
3-77
2-11
a.
Removal.
3-77a
b.
Installation.
3-77b
c.
Operational Check.
3-77c
9
Headlamp Switch Replacement
3-78
2-11
a.
Removal.
3-78a
b.
Installation.
3-78b
c.
Operational Check.
3-78c
10
Blackout Toggle Switch Replacement
3-79
2-11
a.
Removal.
3-79a
b.
Replacement.
3-79b
c.
Operational Check.
3-79c
11
Turn Signal Switch Replacement
3-80
2-11
a.
Removal.
3-80a
b.
Disassembly.
3-80b
c.
Assembly
3-80c
d.
Installation.
3-80d
e.
Operational Check.
3-80e
12
Heater Fan Switch Replacement
3-81
2-11
a.
Removal.
3-81a
b.
Installation.
3-81b
c.
Operational Check.
3-81c
3-386


Back to Top