TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 32 of 852

TM 9-2320-283-20-2
ELECTRICAL SYSTEM.
3-70. ALTERNATOR AND BRACKET REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
B. INSTALLATION (Continued)
30.
Three wires (9),
Install items (9), (11),
Use tags to aid in
(11), and (12)
and (12)
identification.
31.
Batteries
Connect
Refer to paragraph
3-120.
32.
Radiator
Refill
Refer to paragraph 3-52.
33.
Air cleaner inlet
Install
Refer to paragraph 3-32.
C. OPERATIONAL CHECK.
34.
Engine
Start up
Verify voltmeter Refer to TM 9-2320-283-
reads normal
10.
NOTE
Follow-on maintenance action required:
None.
3-404


Back to Top