TM 9-2320-283-20-2
ELECTRICAL SYSTEM.
3-125. SLAVE START RECEPTACLE REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
A.
REMOVAL.
1.
Two screws (2),
Remove from item (5).
Tag item (4) and item
washers (3), cable
(10) for identification.
assembly (4), and
cable assembly
(10).
2.
Four screws (7),
Remove from item (5).
lockwashers (8),
and nuts (1).
3.
Receptacle (5) and
Remove from item (12).
insulator (11).
4.
Cover (6).
Remove from item (5).
B.
INSTALLATION.
5.
Cover (6).
Install on item (5).
6.
Receptacle (5) and
Put in place in item (12).
insulator (11).
7.
Four screws (7),
Secure item (9), item (5),
lockwashers (8),
and item (11) to item (12).
and nuts (1).
8.
Two screws (2) and
Secure item (4) and item
washers (3).
(10) to item (5).
NOTE
Follow-on maintenance action required:
Connect batteries (para 3-120).
3-738