TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 480 of 852

TM 9-2320-283-20-2
TRANSMISSION.
3-141. LINES AND FITTINGS REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
B. OIL COOLER LINES AND FITTINGS REPLACEMENT (Continued). I
16. All parts
Clean and inspect
Refer to paragraphs 3-4
and 3-5.
17. Bracket (21)
a. Position on item (19).
b. Secure with item (20).
18. Bracket (15)
a. Position on item (18).
b. Secure with two items
(16) and (17).
19. Support (10)
a. Position on item (6).
b. Secure with items (11)
and (12).
20. Union (23)
a. Wrap threads with thread
Refer to paragraph 3-7.
sealing tape.
b. Install into item (26).
21. Elbow (4) and new
a. Wrap threads of item
Refer to paragraph 3-7.
O-ring (5)
(4) with thread sealing
tape.
b. Coat item (5) with clean
lubricating oil.
c. Install into item (6).
22. Hose (1)
Put in place under vehicle
and install onto items (4)
and (23).
23. Two elbows (4) and
a. Wrap threads of item (4)
Refer to paragraph 3-7.
new O-rings (5)
with thread sealing tape.
3-852


Back to Top