TM-9-2320-283-20-2

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 2 OF 3

DECEMBER 1983

  TM-9-2320-283-20-2 - Page 794 of 852

TM 9-2320-283-20-2
BRAKE SYSTEM.
3-196. TRAILER COUPLINGS, BRACKETS, AND HOSE REPLACEMENT (Continued).
LOCATION / ITEM
ACTION
REMARKS
D.
FRONT COUPLINGS AND HOSE INSTALLATION.
22.
Hose assembly (2).
Put through loops on item
(4).
23.
Coupling (3) and
a.
Install on item (2).
Put thread sealing tape
coupling (5).
on threads.
Item (5)
goes on blue hose.
b.
Install on item (4).
24.
Hose assembly (2).
Install on two items (1).
Blue hose goes on
bottom.
NOTE
Follow-on maintenance action required:
Close air
system draincocks and start engine (TM 9-2320-283-
10). Check air system for leaks (para 3-8).
3-1166


Back to Top