TM 9-2320-283-20-3
FRAME AND TOWING ATTACHMENTS.
3-223. SECONDARY RESERVOIR SUPPORT REPLACEMENT.
LOCATION/ITEM
ACTION
REMARKS
1. Nut (6), lockwasher Remove from item (8).
(7), two clamps (9),
and one bolt (10).
Item (10) stays in item
(9).
2. Four bolts (1) and
nuts (4).
a. Remove from item (2), (8),
and 3-5.
b. Remove item (2) from item
(5).
3. All parts.
Clean and inspect.
Refer to paragraphs 3-4
and 3-5.
4. Supports (2) and
a. Line up holes in items
(8).
(8) and (2) with holes in
item (5) and (3).
b. Secure with four items (1) If installing only item
and (4).
(2), then task ends
here. Go to follow-on
maintenance. If install-
ing item (8), then do
step 5,
5. Clamp (9) and bolt
a. Position on item (8).
(10).
b. Secure with items (6) and
(7).
NOTE
Follow-on maintenance action required:
Install secondary reservoir (para
3-170).
3-1336