TM-9-2320-283-20-3

TRUCK TRACTOR, LINE HAUL, 50,000 GVWR, 6X4, M915A1

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE PART 3 OF 3

DECEMBER 1983

  TM-9-2320-283-20-3 - Page 239 of 756

TM 9-2320-283-20-3
FRAME AND TOWING ATTACHMENTS.
3-238. TOW PINTLE REPLACEMENT.
THIS TASK COVERS
a. Pintle Hook Removal.
e. Bracket Installation.
b. Pintle Hook Disassembly.
f. Pintle Hook Assembly.
c. Bracket Removal.
g. Pintle Hook Installation.
d. Cleaning and Inspection.
h. Lubrication and Adjustment.
INITIAL SETUP
APPLICABLE CONFIGURATIONS
All.
TEST EQUIPMENT
None.
SPECIAL TOOLS
None.
MATERIALS/PARTS (P/N)
Oil, lubricating: OE/HDO-10
Item 15, Appendix C.
Grease, automotive and artillery
Item 7, Appendix C.
Pin, cotter
(74410) 773.
Pin, cotter
(74410) 119-1.
Pin, cotter
(74410) 770-1.
EQUIPMENT CONDITION
PARAGRAPH
CONDITION DESCRIPTION
None.
None.
PERSONNEL REQUIRED
One (MOS-63S).
REFERENCES (TM)
TM 9-2320-283-20P.
SPECIAL ENVIRONMENTAL CONDITIONS
None.
GENERAL SAFETY INSTRUCTIONS
Engine off.
Transmission in neutral,
Park brake set.
TROUBLESHOOTING REFERENCES
Paragraph 2-11.
3-1412


Back to Top