TM 9-2320-283-20-3
FRAME AND TOWING ATTACHMENTS.
3-243. SPARE TIRE WINCH PILLAR REPLACEMENT (Continued).
LOCATION/ITEM
ACTION
REMARKS
C. INSTALLATION (Continued).
10. Support (12).
a. Position on item (15).
b. Secure with two items
(13), and (16).
11. Pillar (5).
a. Have assistant position
on item (17).
b. Secure with two items
(13), and (16).
12. Nut (11), nut (9), Install on item (10).
and clevis (8).
13. Rod (10).
14. Clevis (8).
15. New pin (7).
Insert threaded end into
hole of item (12).
a. Position on item (5).
b. Secure with item (6).
Install in item (6) and
bend ends over.
16. Nut (14).
Install on item (10), and
tighten.
NOTE
Follow-on maintenance action required:
Install spare tire winch (para
3-242).
Install spare tire winch cable
(para 3-241).