TM 9-2320-283-34-1
Section II. ENGINE
3-8.
GENERAL.
This
section provides
procedures authorized at direct and
general support maintenance levels to replace
engine components.
.
To find a specific procedure contained in this section, see the task summary below:
3-9.
TASK SUMMARY.
INITIAL SETUP:
EQUIPMENT CONDITION
APPLICABLE CONFIGURATIONS
PARAGRAPH
CONDITION DESCRIPTION
All.
(Refer to specific paragraph for this
information).
TEST EQUIPMENT
None.
SPECIAL TOOLS
2 1/2 - Ton overhead lift hoist
with adjustable chain hoist.
Engine lifting fixture
15434 (ST-125).
MATERIALS/PARTS (P/N)
Cable tie
Cotter pin
85757 (10087-2).
Cotter pin
24617 (9427317).
PERSONNEL REQUIRED
SPECIAL ENVIRONMENTAL CONDITIONS
Two (MOS-63W).
Vehicle on level ground away from blowing dirt and dust.
3-10