TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 220 of 1320

TM 9-2320-304-14&P
2-82.72
Operating Instructions (Cont)
2-10.4 LOADING AND UNLOADING CONTAINER (51 INCHES [130 CM] OR TALLER)
TO TRUCK USING FRONT LIFT ADAPTER (FLA) (CONT).
NOTE
Make sure half-height container front hooks face down when installed.
(14)
Position half-height container front hook (13) in slot (15) on slide arm (16) and install pin (12)
and lock pin (11) on front lift adapter (1).
Change 1


Back to Top