TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 445 of 1320

Malfunction
Test or Inspection
Corrective Action
TM 9-2320-304-14&P
4-67
Organizational Maintenance Instructions (Cont)
Table 4-3. Load Handling System (LHS) Troubleshooting (CONT)
LOAD HANDLING SYSTEM (LHS) (CONT)
9. LOSS OF MAIN FRAME SAFE LOWERING FUNCTION (CONT).
WARNING
Remove all jewelry such as rings, dog tags, bracelets, etc. If jewelry or tools contact positive
electrical circuits, a direct short may result. Damage to equipment and injury or death to
personnel may occur.
Step 14.
Check for continuity measured between rectifier wire 1480 and transit valve harness con-
nector terminal 2.
If there is no continuity, repair wire 1480 or notify DS Maintenance.


Back to Top