TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 629 of 1320

TM 9-2320-304-14&P
4-203
Organizational Maintenance Instructions (Cont)
(9)
Install sealing ring (21), washer (22), collar (23), and cable (24) as an assembly on junction
box (3).
(10)
Install wire 1470 (25) and wire 1435 (26) on terminal strip (8).
(11)
Install sealing ring (21), washer (22), collar (23), and cable (27) as an assembly on junction
box (3).
(12)
Install wire 1435 (28) and wire 1475 (29) on terminal strip (8).
(13)
Install sealing ring (21), washer (22), collar (23), and cable (29) in junction box (3) as an
assembly.
(14)
Install wire 1461 (30), wire 1469 (31), and wire 1435 (32) on terminal strip (8).


Back to Top