TM-9-2320-304-14-P

LOAD HANDLING SYSTEM, HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, AND DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2000

  TM-9-2320-304-14-P - Page 837 of 1320

TM 9-2320-304-14&P
5-87
Direct Support and General Support Maintenance (Cont)
b. Installation.
(1)
Install bulkhead connector (1) in compression frame (2) with four screws (3) and locknuts (4).
(2)
Install nut (5) on bulkhead connector (1) and tighten two screws (6).
(3)
Install connector (7) on bulkhead connector (1).
(4)
Connect MC88 connector (8) to proximity switch (hook arm down) connector (9).


Back to Top