TM 9-2320-328-13&P-3
0398-4
DRAFT
0398
Water Tank
Replace
23.80
15, 17
Water Tank Cradle
Replace
30.10
17
7615
INSTRUMENT PANEL
ASSEMBLY
CHECK FOR OPEN
COMPARTMENT DOORS
WHEN LIGHT IS ON
Indicator
Replace
0.50
17
Cab Warning Light and
CHECK FOR OPEN
COMPARTMENT DOOR
WHEN LIGHT IS ON
Flasher Unit(s)
Replace
1.00
17
Cab Pressure Governor
Control
Replace
1.00
10, 11, 12,17
Cab Panel Indicator
Replace
0.30
17
Cab Rocker Switch
Replace
0.60
17
Cab Water and/or Foam
Level Gauge(s)
Replace
0.30
17
Cab 1-2-3 Signal Indicator
Lamp Holder
Replace
0.40
17
Cab 1-2-3 Signal Indicator
Lamp
Replace
0.50
17
Warning Buzzer (Cab and
Pump Operator's Panel)
Replace
0.30
17
Cab Instrument Panel
Assembly
Replace
6.00
17
Cab Instrument Panel
Replace
5.00
17
Pump Operator's Panel
Cover
Replace
0.50
17
Pump Operator's Panel
Open/Close
0.10
17
Pump Operator's Panel
Replace
7.00
17
Pump Operator's Panel
Electric Valve Control
Replace
1.00
17
Pump Operator's Panel
Electric Valve Control
Meter
Replace
0.30
17
Pump Operator's Panel
Foam Level Gauge
Replace
1.00
17
Pump Operator’s Panel
Water Level Gauge
Replace
0.50
17
Table 1.
Maintenance Allocation Chart (MAC) for HEWATT. (Continued)
(1)
Group
Number
(2)
Component/
Assembly
(3)
Maintenance
Function
(4)
Maintenance Level
(5)
Tools
and Test
Equipment
Ref Code
(6)
Remarks
Code
Field
Sustainment
Crew
Service
Field
Below
Depot
Depot
COFHD