18. Pay out cable (9) while assistant pulls cable (9) until it is 6 in. to 1 ft. (15 cm to 30 cm)
past the front roller guide (12).
13
9
13
M977 SHOWN
15
14
9
12
Figure 10.
NOTE
•
Do not place cable between tensioning device pulleys at this time.
•
When pulling cable through tensioning device, push sheave towards
frame rail to allow clevis to pass through.
19. Pay out cable (9) while assistant pulls cable (9) until it is 6 in. to 1 ft. (15 cm to 30 cm)
past the front roller guide (12).
TM 9-2320-338-10
0084
0084-8