Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
10
After
Air Res-
ervoirs
1.
Drain all air reservoirs by opening
five air reservoir drain valves on
air system drain manifold under
battery box.
AIR RESERVOIR
DRAIN VALVES
Figure 2.
2.
Once all air is exhausted from air
reservoirs, close air reservoir
drain valves on air system drain
manifold.
CAUTION
Clean around end of fill tube
prior to removing dipstick.
This will aid in preventing dirt
TM 9-2320-338-10
0144
0144-8