TM-9-2320-338-10

TRUCK, CARGO, 8X8, M977A4

TECHNICAL MANUAL; OPERATOR'S MANUAL

OCTOBER 2008

  TM-9-2320-338-10 - Page 875 of 1120

Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
violate AR 385-55. (WP
0160)
24
After
Portable
Beacon
Light (If
equip-
ped)
Remove beacon light from glove box
and check for proper operation. (WP
0069)
NOTE
Complete this PMCS proce-
dure only if material handling
crane was used during mis-
sion.
25
After
Material
Handling
Crane (if
used)
1.
Inspect crane for loose nuts and
bolts, hydraulic leaks, damage to
hydraulic hoses and lines, and
obvious damage.
Class III
leak or dam-
age to ho-
ses, lines,
or fittings.
NOTE
For more information on ma-
terial handling crane operat-
ing instructions, refer to grove
crane operation (manual con-
trol) procedures. (WP 0038)
2.
Check that crane hydraulic sys-
tem is operable as follows:
a.
Start engine. (WP 0044)
b.
Set HYD ENABLE switch in
on position. MAIN HYD EN-
TM 9-2320-338-10
0144
0144-19


Back to Top