TM-9-2320-342-10-1

TRUCK, WRECKER, 8X8 M984A4

TECHNICAL MANUAL; OPERATOR'S MANUAL

OCTOBER 2008

  TM-9-2320-342-10-1 - Page 1315 of 1428

WINCH MIRED VEHICLE FORWARD - Continued
When pulling cable through tensioning device, push sheave towards
frame rail to allow clevis to pass through.
12.
Pay out cable (9) while assistant pulls cable (9) until it is 6 in. to 1 ft. (15 cm to 30 cm)
past the front roller guide (12).
13
9
13
M977A4 SHOWN
15
14
12
9
Figure 5.
13.
Stop paying out cable (9).
14.
Assistant routes cable (9) through cable guide (13), over sheave (14), between roller
(15), and side of cable guide (13).
15.
Pay out winch cable (10) as assistant routes cable over first axle and 1 ft. (30 cm)
past front roller guide assembly (12).
TM 9-2320-342-10-1
0115
0115-5


Back to Top