TM-9-2320-344-10

TRUCK, CARGO, GUIDED MISSILE TRANSPORTER (GMT), 8X8, M985A4GMT

TECHNICAL MANUAL; OPERATOR'S MANUAL

OCTOBER 2008

  TM-9-2320-344-10 - Page 799 of 1012

Table 1.
PMCS - AFTER - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
violate AR 385-55. (WP
0143)
24
After
Portable
Beacon
Light (If
equip-
ped)
Remove beacon light from glove box
and check for proper operation. (WP
0066)
NOTE
Complete this PMCS
procedure only if material
handling crane was used
during mission.
Engine must be running
to perform this check.
25
After
Material
Handling
Crane (if
used)
1.
Check crane for loose parts, hy-
draulic leaks, and damage to hy-
draulic hoses and lines.
Class III
leak
present,
loose/dam-
aged parts
or hydraulic
hoses.
TM 9-2320-344-10
0127
0127-19


Back to Top