Table 1.
PMCS - WEEKLY - Continued
Item
No.
Interval
Item to
be
Checked
or
Serviced
Procedure
Equipment
Not Ready/
Available If:
b.
Check fan control.
c.
Check cabin air directional
control.
d.
Check heater temperature
control.
e.
Check air conditioning con-
trol.
NOTE
•
For more information on
material handling crane
operating instructions,
refer to HIAB crane
operation procedures.
(WP 0036)
•
Engine must be running
to perform this check.
29
Weekly
Material
Handling
Crane
1.
Check crane for loose parts, hy-
draulic leaks, and damage to hy-
draulic hoses and lines.
Class III
leak
present,
loose/dam-
aged parts
or hydraulic
hoses.
TM 9-2320-344-10
0128
0128-31