HIGH-BANK LAUNCH OF BRIDGE BAY
NOTE
•
This procedure is a two soldier task.
•
If several bridge bays are to be high-bank launched, vehicles must
be positioned perpendicular to the water. All bridge bays are
launched from these vehicles. The bridge bays on the other vehicles
are unloaded parallel to the water behind the launching vehicles.
Perform Steps (1) and (2) if required.
1.
Lock the BAP to the vehicle. Push curb-side and road-side BAP hold-down lock handles
(1) in.