TM-9-2320-361-24-1

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 1 OF 2

AUGUST 2006

  TM-9-2320-361-24-1 - Page 869 of 1176

TM 9-2320-361-24-1
0133 00
0133 00-1
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
TRANSFER CASE CONTROLS AND LINKAGE MAINTENANCE (W/PTO)
REMOVAL, CLEANING AND INSPECTION, INSTALLATION, AND PTO LOCK ADJUSTMENT
INITIAL SETUP:
Applicable Models
M49A2C and M50A3
Personnel Required
Two
Materials/Parts
Locknut (item 155, WP 0470 00)
Two bushings (item 7, WP 0470 00)
Four cotter pins (item 25, WP 0470 00)
Five locknuts (item 129, WP 0470 00)
Five locknuts (item 147, WP 0470 00)
Materials/Parts (Contd)
Woodruff key (item 380, WP 0470 00)
Skysol 100 (item 13, WP 0468 00)
Rags (item 27, WP 0468 00)
References
WP 0020 00
Equipment Condition
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Battery ground cable disconnected
(WP 0126 00).
Driver’s seat removed (WP 0236 00).
Cab tunnel removed (WP 0230 00).
REMOVAL
1.
Place transfer case PTO shift handle (1) in NEUTRAL position and turn shift lever lock (2)
parallel to PTO shift handle (1).
2
1


Back to Top