TM-9-2320-361-24-2

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 2 OF 2

AUGUST 2006

  TM-9-2320-361-24-2 - Page 362 of 1144

TM 9-2320-361-24-2
0290 00
0290 00-4
WATER TANK DISCHARGE VALVE CONTROL LEVERS MAINTENANCE (M50A3) (Contd)
4
5
6
7
3
2
1
11
10
9
8
END OF WORK PACKAGE
INSTALLATION
1.
Install two cables (6) through adapters (5) and plate (7).
2.
Install discharge valve control assembly (3) under shelf (2) with six screws (1) and new locknuts (11).
3.
Install two adapters (5) to plate (7).
4.
Insert two screws (8) in two valve control levers (9) and install nuts (10). Do not tighten nuts (10).
5.
Thread cables (6) through holes in screws (8).
6.
Install two coupling nuts (4) on adapters (5).
7.
Remove slack in two cables (6) and tighten nuts (10).
ADJUSTMENT
NOTE
Hold end of cable securely before loosening nuts. Cable may be
under tension.
1.
Loosen two nuts (10).
2.
Remove slack in two cables (6) and tighten nuts (10).
3.
Connect battery ground cable (WP 0126 00).
4.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).


Back to Top