TM-9-2320-361-24-2

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 2 OF 2

AUGUST 2006

  TM-9-2320-361-24-2 - Page 533 of 1144

TM 9-2320-361-24-2
0341 00
0341 00-1/2 blank
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
SIDE RAIL MAINTENANCE
REMOVAL, CLEANING, AND INSTALLATION
INITIAL SETUP:
Applicable Models
M185A3, M109A3
Tools and Special Tools
General mechanic’s tool kit
(item 116, WP 0469 00)
Materials/Parts
Fifty-four rivets (item 315, WP 0470 00)
Materials/Parts (Contd)
Fifty-four plugs (item 310, WP 0470 00)
Tar (item 52, WP 0468 00)
Equipment Condition
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Battery ground cable disconnected
(WP 0126 00).
NOTE
Side rails on both sides of van body are removed and installed
the same. This task covers one side.
REMOVAL
1.
Drill fifty-four plugs (3) and rivets (2) out of side rail (4) and van wall (1).
2.
Remove two side rails (4) from van wall (1).
CLEANING
Clean all tar out of rivet holes (5) and side rail (4).
INSTALLATION
NOTE
A sealer coat of hot tar must be applied to inside of rail in area
of rivet holes before installation.
1.
Install two side rails (4) on van wall (1) with fifty-four new rivets (2) and fifty-four plugs (3).
2.
Connect battery ground cable (WP 0126 00).
3.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
END OF WORK PACKAGE
~
1
2
2
3
3
4
4
5


Back to Top