TM-9-2320-361-24-2

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 2 OF 2

AUGUST 2006

  TM-9-2320-361-24-2 - Page 665 of 1144

TM 9-2320-361-24-2
0380 00
0380 00-5/6 blank
PRIMARY HEATER AND DUCT REPLACEMENT (Contd)
HEATER INSTALLATION
1.
Install support (22) on van wall (13) with four screws (21).
2.
Install exhaust tube (25) and new gasket (23) on van wall (13) with four screws (24).
3.
Install exhaust tube (25) and new gasket (27) on support (22) with four screws (26).
4.
Install guard (28) on van wall (13) with two screws (30).
5.
Install guard (28) on support (22) with screw (29).
6.
Install new O-ring (34), washer (35), and heater (16) on support (22) with two clamps (32).
7.
Install cover (14) on heater box (31) with three screws (15).
8.
Install adapter (17) on heater (16) with four screws (33).
9.
Install duct (19) on adapter (17) with clamp (18).
10.
Install heater harness (20) on heater (16).
11.
Check heater for proper operation (TM 9-2320-361-10).
12.
Connect battery ground cable (WP 0126 00).
13.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
~
END OF WORK PACKAGE
16
15
14
31
30
29
28
26
27
25
24
23
22
21
13
19
20
18
17
33
32
34
35
32


Back to Top