TM-9-2320-361-24-2

2-1/2 TON, 6X6, M44A2 SERIES TRUCKS

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE PART 2 OF 2

AUGUST 2006

  TM-9-2320-361-24-2 - Page 678 of 1144

TM 9-2320-361-24-2
0384 00
0384 00-4
SECONDARY HEATER AND DUCT REPLACEMENT (Contd)
DUCT REMOVAL
1.
Unbuckle strap (2) and remove duct (4) from strap (2). Remove screw (3) and strap (2) from van
wall (1).
2.
Unbuckle strap (7) and remove adapter (6). Remove two screws (8), screw (9), strap (7), and
deflector (12) from van wall (1).
3.
Remove three screws (10) and deflector (12) from van floor (11).
4.
Remove clamp (5) and adapter (6) from duct (4).
DUCT INSTALLATION
1.
Install adapter (6) and clamp (5) on duct (4).
2.
Install deflector (12) on van floor (11) with three screws (10).
3.
Install strap (7) and deflector (12) on van wall (1) with two screws (8) and screw (9). Buckle
strap (7) on adapter (6).
4.
Install strap (2) on van wall (1) with screw (3). Buckle strap (2) on duct (4).
~
~
1
2
3
4
5
6
12
11
10
9
8
7


Back to Top