TM-9-2320-365-20-1

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 1 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-1 - Page 97 of 1760

TM 9-2320-365-20-1
Change 2
2-21
Table 2-1.
Preventive Maintenance Checks and Services
(Cont)
Item
No.
Interval
Location
Item to be
Checked
or
Serviced
Procedure
Not Fully Mission
Capable If:
8
Semiannual
TRANS-
MISSION
(Cont)
d.
Inspect transmission oil cooler tubes/hoses for
leaks.
d.
Class III leak is
evident.
e.
Inspect scavenge pump hose for leaks.
e.
Class III leak is
evident.
9
Semiannual
ENGINE
MOUNTS
Check engine mounts for loose hardware or cracks.
Engine mounts
are loose or
damaged.
10
Semiannual
ENGINE
CRANK-
CASE
WARNING
Ensure engine is cool before performing
maintenance.
Failure to comply may
result in injury to personnel.
Initial valve clearance adjustment on new
engines, rebuilt engines, or remanufactured
engines is required at initial 6,000 miles of
engine operation.
The adjustment is
necessary due to the initial wear of the
valve train components and seating of the
valve train components.
Notify DS
Maintenance if initial valve clearance
adjustment is required.
Failure to comply
may result in damage to equipment.
CAUTION


Back to Top