TM-9-2320-365-20-2

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 2 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-2 - Page 219 of 1432

TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
2-1273
2-1273
2-1273
2-1273
2-1273
CONTINUITY TEST
(1)
Loosen screw in terminal board TB4.
(2)
Remove wire 1499M from terminal board TB4.
(3)
Set multimeter to ohms.
(4)
Connect positive (+) probe of multimeter to
wire 1499M.
(5)
Connect negative (-) probe of multimeter to air
conditioner connector J242 socket D and note
reading on multimeter.
(6)
If continuity is not present, repair or replace
wire 1499M (para 2-40).
(7)
Install wire 1499M on terminal board TB4.
(8)
Tighten screw in terminal board TB4.
(9)
Install cover on 110/208 VAC POWER
DISTRIBUTION PANEL with six screws.


Back to Top