TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
2-1353
2-1353
2-1353
2-1353
2-1353
CONTINUITY TEST
(1)
Pull out circuit breaker CB10
(TM 9-2320-365-10).
(2)
Loosen screw in cover.
(3)
Open cover on relay box assembly.
(4)
Set multimeter to ohms.
(5)
Position LIGHTS/BLACKOUT OVERRIDE switch
S33 to BLACKOUT OVERRIDE
(TM 9-2320-365-10).
(6)
Connect positive (+) probe of multimeter to wire
707A terminal lug on LIGHTS/BLACKOUT
OVERRIDE switch S33.
(7)
Connect negative (-) probe of multimeter to wire
1511 terminal lug on LIGHTS/BLACKOUT
OVERRIDE switch S33 and note reading on
multimeter.
(8)
If continuity is not present, replace LIGHTS/
BLACKOUT OVERRIDE switch S33 (para 16-56).