TM-9-2320-365-20-2

M1078 SERIES, 2 1/2-TON, 4 X 4, LIGHT MEDIUM TACTICAL VEHICLES (LMTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; UNIT MAINTENANCE; VOLUME NO. 2 OF 5

FEBRUARY 2006
CHANGE 3

  TM-9-2320-365-20-2 - Page 35 of 1432

TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
TM 9-2320-365-20-2
2-1089
2-1089
2-1089
2-1089
2-1089
CONTINUITY TEST
(1)
Remove six screws and 110/208 VAC POWER
DISTRIBUTION PANEL cover from power
distribution panel.
(2)
Remove circuit breaker CB8 from power
distribution panel.
(3)
Position circuit breaker CB8 to ON.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter to
output terminal of circuit breaker CB8.
(6)
Connect negative (-) probe of multimeter to
input terminal of circuit breaker CB8 and note
reading on multimeter.
(7)
If continuity is not present, replace circuit
breaker CB8 (para 16-64).
(8)
Install circuit breaker CB8 in power distribution
panel.


Back to Top