TM 9-2320-365-20-5
20-526
Change 2
20-88.
DIGITIZATION KIT POWER CABLE REMOVAL/INSTALLATION (CONT)
(30) Connect terminal lug TL14 (6) to terminal block TB2
connector 43 (7).
(31) Install terminal lug TL21 (4) on ground stud (5) with
washer (3), lockwasher (2), and nut (1).
c. Follow-on Maintenance
(1)
Install power distribution panel (TM 9-2320-365-20-3).
(2)
Install kick panel (TM 9-2320-365-20-4).
(3)
Connect batteries (TM 9-2320-365-20-3).
(4)
Operate equipment, check for proper operation.
End of Task