TM 9-2320-365-34-2
15-128.2
Change 2
15-8.
CARGO BED REPLACEMENT/REPAIR (CONT)
(2)
Remove nut (7), spacer (8), teflon washer (9), D-
ring retainer (10), and D-ring (11) from cast tie
down cup (12).
g.
Tie Down Installation.
(1) Position D-ring (1) in D-ring retainer (2).
(2) Position teflon washer (3) on D-ring retainer (2).
(3) Position D-ring retainer (2) in stamped tie down
cup (4)
(4) Position washer (5) and nut (6) on D-ring retainer
(2).
(5)
Tighten nut (6) to 76-94 lb-ft (103-128 N•m).
NOTE
Perform step (2) on tie down with cast cups.
NOTE
•
There are two types of tie down cups
installed on cargo beds. On the
underside, stamped cups have raised
center sections and cast cups have flat
center sections.
•
Steps (1) through (10) require the aid of
an assistant.
•
Perform steps (1) through (5) on tie
downs with stamped cups.