TM-9-2320-366-10-1

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; OPERATOR’S INSTRUCTIONS; VOLUME NO. 1 OF 2

AUGUST 2005
CHANGE 2

  TM-9-2320-366-10-1 - Page 157 of 802

TM 9-2320-366-10-1
Figure 2-19. Material Handling Crane (MHC) Controls (Cont)
6. POWER Switch.
Two-position switch controls electrical power to the MHC.
7. MANUAL OVERRIDE Switch.
Pushbutton switch used to override the MHC
overload protection system in an emergency.
8. LH O/R (Left Hand Outrigger) JACK Lever.
Raises and lowers the left side
outrigger.
9. MAST Lever.
Raises and lowers the mast.
10. RH O/R (Right Hand Outrigger) JACK Lever.
Raises and lowers the right side
outrigger.
2-27


Back to Top