TM-9-2320-366-10-1

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; OPERATOR’S INSTRUCTIONS; VOLUME NO. 1 OF 2

AUGUST 2005
CHANGE 2

  TM-9-2320-366-10-1 - Page 403 of 802

TM 9-2320-366-10-1
f. Raise Boom.
WARNING
Determine required Light Material Handling Crane (LMHC) settings
prior to raising boom.
Failure to comply may result in injury to
personnel or damage to equipment.
NOTE
Steps (1) through (8) require the aid of an assistant.
(1) Support end of boom (1).
NOTE
Perform steps (2) through (5) to raise the boom to the O-degree position.
(2) Remove quick release pin (2) from turret (3).
(3) Raise boom (1) to O-degree position.
(4) Align holes in turret (3) and boom (1).
(5) Install quick release pin (2) in turret (3).
2-261


Back to Top